Febrian, Gilang, and M. Arif Wibisono. “Analisis Kelayakan Ekonomi Perancangan Pabrik Kelapa Sawit Mini Dengan Kapasitas 1000 Ton Per Tahun Menggunakan Metode Life Cycle Costing: Studi Kasus Desa Bukit Layang, Bangkabelitung”. Jurnal Sosial Teknologi 5, no. 9 (September 3, 2025): 3405–3415. Accessed February 16, 2026. https://sostech.greenvest.co.id/index.php/sostech/article/view/32396.